Isuzu Truper - Isuzu Trooper
1. The maintenance instruction
2. Maintenance service
3. Engines
   3.1. Specifications of the engine and adjusting works
   3.2. An electric equipment and major repairs of engines
   3.3. The diesel engine of 2,8 litres
      3.3.1. Introduction
      3.3.2. Technical characteristics
      3.3.3. Compression check
      3.3.4. The top dead point of the piston № 1 (ВМТ)
      3.3.5. Backlashes of valves
      3.3.6. A cover of a head of cylinders
      3.3.7. A pulley of a cranked shaft
      3.3.8. Casings of a gear belt of a drive of a camshaft
      3.3.9. A gear belt of a drive of a camshaft
      3.3.10. Asterisks of a gear belt, натяжитель and intermediate pulleys
      3.3.11. Коромысла and pushers
      3.3.12. A head of the block of cylinders
      3.3.13. Oil картер
      3.3.14. The oil pump
      3.3.15. An oil radiator
      3.3.16. Epiploons of a camshaft and a cranked shaft
      3.3.17. A flywheel
      3.3.18. Fastenings of the engine / of a transmission
4. System of decrease in toxicity
5. Fuel system
6. Transmission and a running gear
7. A suspension bracket and a steering
8. Brake system
9. A body
10. A body electric equipment
11. Diagnostics of malfunctions
12. Electroschemes





Isuzu Trooper>> Engines>> The diesel engine of 2,8 litres>> Cover of a head of cylinders

3.3.6. A cover of a head of cylinders

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Ослабьте a lock clip also lift the receiver, connecting the throttle valve of system of fast heating of the engine with a metal tube of an intermediate cooler.
3. Disconnect vacuum hoses from the throttle valve, having taken into consideration their correct arrangement.
4. Ослабьте a clip, крепящий a tube of the throttle valve to a collector.
5. Unscrew fixing bolts and disconnect the throttle valve from an inlet collector.
6. Disconnect a ventilating hose from a cover of a head of cylinders.
7. Unscrew fixing bolts and nuts, крепящие a tube of the control of exhaust gases to collectors, and lift the receiver.
8. Remove linings from both ends of a tube and throw out them; at installation carrying out will be necessary new.
9. Uncover маслозаливной mouths, unscrew fixing bolts and remove isolating lining from a cover of a head of cylinders.
10. Ослабьте also remove fixing nuts together with washers.
11. Uncover heads of cylinders and a cover lining.
12. Examine a lining and washers; if on them there are traces of damages or deterioration it is necessary to replace these details.

Installation

PERFORMANCE ORDER
1. Before to establish, examine an internal surface of a cover of a head of cylinders on presence of adjournment from oil deposits or any other pollution.
2. If necessary clean a cover paraffin or water-soluble solvent.
3. Dry a cover before to establish it into place.
4. Be convinced that a cover dry and pure and establish on it a lining.
5. Establish a cover on a head of cylinders.
6. Check up, whether the lining was displaced.
7. Put on sealing washers and counternuts.
8. Tighten nuts till the demanded moment of an inhaling.
9. Establish isolating lining and tighten fixing bolts.
10. Connect a ventilating hose.
11. Check up, that joined surfaces of a tube of the control of exhaust gases were pure and dry.
12. Put on new linings the tube ends, establish a tube into place and tighten bolts and nuts of its fastenings.
13. Establish the throttle valve of system of fast heating of the engine and tighten its fixing bolts.
14. Check up, that vacuum hoses have been connected correctly.
15. Connect a wire of the minus plug of the accumulator.